流沙层置换注浆施工技术
引用本文:陈金山,张世轶. 流沙层置换注浆施工技术[J]. 山西煤炭, 2012, 32(2): 71-73
作者姓名:陈金山  张世轶
作者单位:河南煤业(焦煤)集团中马村矿,河南焦作,454003
摘    要:针对厚度11m、水压1.5 MPa、最大单孔涌水量153.9 m3/h流沙层,采用二次置换注浆,并用钢筋混凝土作为骨架加固井筒周边,使井筒周边形成结石体帷幕;探注孔涌水量超标即注脲醛树脂化学浆液,采用小段高掘砌施工方式,加强并筒支护强度,顺利通过了流沙层.

关 键 词:流沙层  置换注浆  小段高掘进

Replacement Grouting Technology in Drift Sand Layer
CHEN Jin-shan , ZHANG Shi-yi. Replacement Grouting Technology in Drift Sand Layer[J]. Shanxi Coal, 2012, 32(2): 71-73
Authors:CHEN Jin-shan    ZHANG Shi-yi
Affiliation:(Zhongmacun Mine,Henan Coking Coal Group,Jiaozuo,Henan 454003)
Abstract:A specific drift sand layer(11 meters deep,water pressure=1.5Mpa,and maximum single-hole water yield=153.99m3/h) used secondary replacement grouting;reinforced concrete strengthened around the shaft as skeleton;and aggregated masses shield formed.If water flow of detection hole exceeded standard,urea-formaldehyde resin chemical slurry would be grouted.Small section high driving was used to reinforce shaft support,which passed the drift sand layer successfully.
Keywords:drift sand layer  replacement grouting  small section high driving