首页 | 本学科首页   官方微博 | 高级检索  
     


A geometric-process repair-model with good-as-new preventive repair
Authors:Yuan Lin Zhang
Affiliation:Dept. of Appl. Math., Southeast Univ., Nanjing ;
Abstract:This paper studies a deteriorating simple repairable system. In order to improve the availability or economize the operating costs of the system, the preventive repair is adopted before the system fails. Assume that the preventive repair of the system is as good as new, while the failure repair of the system is not, so that the successive working times form a stochastic decreasing geometric process while the consecutive failure repair times form a stochastic increasing geometric process. Under this assumption and others, by using geometric process we consider a replacement policy N based on the failure number of the system. Our problem is to determine an optimal replacement policy N such that the average cost rate (i.e., the long-run average cost per unit time) is minimized. The explicit expression of the average cost rate is derived, and the corresponding optimal replacement policy can be determined analytically or numerically. And the fixed-length interval time of the preventive repair in the system is also discussed. Finally, an appropriate numerical example is given. It is seen from that both the optimal policies N** and N* are unique. However, the optimal policy N** with preventive repair is better than the optimal policy N* without preventive repair
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号