首页 | 本学科首页   官方微博 | 高级检索  
     

大连越秀广场大厦结构转换层施工
引用本文:周光毅,刘进贵. 大连越秀广场大厦结构转换层施工[J]. 建筑技术, 2003, 34(5): 362-364,
作者姓名:周光毅  刘进贵
作者单位:中国建筑第八工程局大连公司
摘    要:大连越秀广场大厦大体积转换梁施工中,采用降低混凝上温度应力和提高混凝土自身抗拉性能的方法,有效控制温度裂缝,工程质量优良:同时,采用荷载分流方案后,节省了支撑体系费用,也取得较好的经济效益。

关 键 词:转换梁 混凝上 温差裂缝 支撑体系
文章编号:1000-4726(2003)05-0362-03

CONSTRUCTION OF STRUCTURAL CHANGE-OVER LAYER OF DALIAN YUEXIU PLAZA
ZHOU Guangyi LIU Jingui. CONSTRUCTION OF STRUCTURAL CHANGE-OVER LAYER OF DALIAN YUEXIU PLAZA[J]. Architecture Technology, 2003, 34(5): 362-364,
Authors:ZHOU Guangyi LIU Jingui
Affiliation:ZHOU Guangyi LIU Jingui
Abstract:In the construction of the la rge volu me change-over beam of Dalian Yuexiu Plaza,it has been adopted that decreasin g the concrete temperature stress and increasing concrete anti-digging to contr ol effec-tively the cracks caused by temperature difference and achieve the goo d quality of the project.At the same time ,adopting the scheme of load forc e flow has saved the cost of supporting system and achieved economic profits.
Keywords:change-over beam  concrete  crack caused by temperature difference  br aced framing
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号