首页 | 本学科首页   官方微博 | 高级检索  
     

分岔合并下伏煤层破碎顶板超前注浆加固技术
引用本文:查文华,华心祝,黄嵘,熊礼军.分岔合并下伏煤层破碎顶板超前注浆加固技术[J].地下空间与工程学报,2012,8(5):1014-1020.
作者姓名:查文华  华心祝  黄嵘  熊礼军
作者单位:1.安徽理工大学煤矿安全高效开采省部共建教育部重点实验室,安徽 淮南 232001;2.安徽理工大学能源与安全学院,安徽 淮南 232001
基金项目:国家自然科学基金(51004002);高等学校博士点新教师基金(20103415120001);安徽省高校省级自然科学研究项目(KJ2012A088);淮南市科技计划项目(2010A03106)
摘    要:分岔合并下伏煤层分层开采中,上覆煤层的采动对底板有一定的破坏影响范围,导致下层煤工作面顶板破碎,严重影响下伏煤层的正常回采。针对淮北矿业(集团)有限责任公司许疃矿71煤与72煤分岔合并现象,通过理论分析和数值模拟分析了7118工作面采动影响下底板破坏深度的范围;通过室内力学试验确定了最佳浆液水灰比为1∶1,水泥-水玻璃体积比为1∶0.4~1∶0.6之间;设计了7225工作面顶板注浆参数和注浆孔布置;通过数值模拟、相似模拟综合分析了预注浆加固效果,注浆后煤壁及顶板稳定性明显增强,顶板控制效果明显。

关 键 词:分岔合并  下伏煤层  破碎顶板  注浆加固  
收稿时间:2012-06-14

Pre-grouting Technology for Broken Roof of Lower Coal Seam of Splitting and Merging Coal
Zha Wenhua,Hua Xinzhu,Huang Rong,Xiong Lijun.Pre-grouting Technology for Broken Roof of Lower Coal Seam of Splitting and Merging Coal[J].Chinese Journal of Underground Space and Engineering,2012,8(5):1014-1020.
Authors:Zha Wenhua  Hua Xinzhu  Huang Rong  Xiong Lijun
Affiliation:1. Key Laboratory of Mine Safety and High Efficient Mining Cosponsored by Anhui Province and Ministry of Education, Anhui University of Science and Technology, Huainan, Anhui 232001, China;2. School of Energy and Safety, Anhui University of Science and Technology, Huainan, Anhui 232001, China
Abstract:In the layering mining of lower coal seam of spilling and merging coal, the overlying coal mining has a certain destructive effect on the floor, resulting in cracking of the roof of lower coal seam and it seriously influences the normal mining of the lower coal seam. Considering the condition of splitting and merging of 71 and 72 coal seams in Xutuan Mine, Huaibei mining (group) Co., Ltd., the scope of destroying depth of the floor under the effect of 7118 working face mining is analyzed by means of theoretical analysis and numerical simulation method. By mechanical tests it is determined that the best water-cement ratio of paste is 1:1, the volumetric cement-silicate ratio is between 1:0.4 to 1:0.6, then the grouting parameters and grouting hole layout for 7225 working face roof have been designed. The pre-grouting effect is analyzed through numerical and analog simulation. The industrial experiment shows that the rib and roof stability is significantly enhanced after grouting, and the roof control effect is obvious.
Keywords:splitting and merging  lower coal seam  broken roof  grouting reinforcement  
本文献已被 CNKI 等数据库收录!
点击此处可从《地下空间与工程学报》浏览原始摘要信息
点击此处可从《地下空间与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号