首页 | 本学科首页   官方微博 | 高级检索  
     

黄龙滩电厂溢洪闸门计算机监控系统优化配置
引用本文:王虎. 黄龙滩电厂溢洪闸门计算机监控系统优化配置[J]. 湖北电力, 2005, 29(6): 30-32
作者姓名:王虎
作者单位:黄龙滩电厂,湖北,十堰,442005
摘    要:黄龙滩电厂溢洪闸门计算机监控系统配置按先进性、实用性、可扩展性、可维护性及高可靠性来选择硬件和软件功能,达到无人值班,少人值守的生产管理要求。

关 键 词:监控系统 配置 优化
文章编号:1006-3986(2005)06-0030-03
收稿时间:2005-11-15
修稿时间:2005-11-15

Optimized Configuration of Computerized Monitoring System for Spillway Gate of Huanglongtan Power Plant
WANG Hu. Optimized Configuration of Computerized Monitoring System for Spillway Gate of Huanglongtan Power Plant[J]. Hubei Electric Power, 2005, 29(6): 30-32
Authors:WANG Hu
Affiliation:Huanglongtan Power Plant, Shiyan Hubei 442005, China
Abstract:The selection of hardware and software functions was on the basis of advance,feasibility, expansibility,convenient maintenance and high reliability in order to meet the requirement for the attendant free or less attendant production management.
Keywords:monitoring svstem   configuration   optimization
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号