首页 | 本学科首页   官方微博 | 高级检索  
     

“长春国际商业贸易中心”温度缝的处理
引用本文:钱永梅.“长春国际商业贸易中心”温度缝的处理[J].吉林建筑工程学院学报,1997(2):14-18.
作者姓名:钱永梅
作者单位:承包公司
摘    要:本文较详细论述了“长春国际商业贸易中心”温度缝的不同情况的处理方法,同时对温度缝处结构设计中形成的25.5米高无侧向支撑柱的构造处理作了详细介绍。文中介绍的处理方法已在实际施工中实施。

关 键 词:长春国际商业贸易中心  处理  温度缝  柔性连接  荷载

The Methods for Dealing with the Temperature-Crack about Changchun International Trade and Commerce Center
Qian Yongmei.The Methods for Dealing with the Temperature-Crack about Changchun International Trade and Commerce Center[J].Journal of Jilin Architectural and Civil Engineering,1997(2):14-18.
Authors:Qian Yongmei
Affiliation:Contracting Construction Company
Abstract:In this paper, the methods for dealing with the temperature-crack about Changchun International Trade and Commerce Center at various situatinons are intro-duced in detail. Meantime, the structure treatment methods about design of 25- 5 metres high column without suportting at side-direction in structure design are introduced here. And. the introduced methods have been implemented in practical construction.
Keywords:temperature crack  soft link  construction  structure  suportting  loading  section
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号