首页 | 本学科首页   官方微博 | 高级检索  
     

控压钻井井下不可测变量的非线性估计
引用本文:徐宝昌,孟宇,刘伟. 控压钻井井下不可测变量的非线性估计[J]. 石油学报, 2016, 37(12): 1543-1549. DOI: 10.7623/syxb201612010
作者姓名:徐宝昌  孟宇  刘伟
作者单位:1. 中国石油大学地球物理与信息工程学院 北京 102249;2. 中国石油集团钻井工程技术研究院 北京 102206
基金项目:国家重大科技专项(2011ZX05027-005,2011ZX05021-003)资助。
摘    要:控压钻井井下流量和压力的变化是判断井下工况的重要标志。从准确估计井下流量和压力的角度出发,以井筒为对象建立井下三阶动态模型,该模型中含有未知参数和未知状态,模型中摩擦因数项作为未知参数变量,井下流量和压力作为未知状态变量。以此模型为基础,建立李雅普诺夫函数,设计一种全新的非线性状态观测器,估计井下未知参数和未知状态,同时保证观测器估计误差收敛到零。利用钻井数据和井筒模拟器,分别在不存在建模误差和存在建模误差的条件下对非线性状态观测器进行仿真,两种条件下的仿真结果表明,该观测器均能够快速、实时、准确地估计井下流量和压力。

关 键 词:控压钻井  动态模型  非线性观测器  状态估计  建模误差  
收稿时间:2016-01-20
修稿时间:2016-09-29

Nonlinear estimation of the down-hole unmeasurable variables in the managed pressure drilling system
Xu Baochang,Meng Yu,Liu Wei. Nonlinear estimation of the down-hole unmeasurable variables in the managed pressure drilling system[J]. Acta Petrolei Sinica, 2016, 37(12): 1543-1549. DOI: 10.7623/syxb201612010
Authors:Xu Baochang  Meng Yu  Liu Wei
Affiliation:1. Geophysics and Information Engineering College, China University of Petroleum, Beijing 102249, China;2. CNPC Drilling Research Institute, Beijing 102206, China
Abstract:The change of down-hole flow and pressure is an important symbol that has used to determine down-hole drilling condition in managed pressure drilling. Based on the accurate estimation of down-hole flow and pressure, a three-order down-hole dynamic model was established taking wellbore as the subject, which has unknown parameters and unknown states. In this model, friction factor is the unknown parametric variable, and down-hole flow and pressure are the unknown state variables. Based on this model, a Lyapunov function was established to design a new nonlinear state observer which can estimate down-hole unknown parameters and unknown states, thus ensuring that estimation error of the observer can be converged to 0. Using drilling data and a wellbore simulator, the nonlinear state observer was simulated under the condition of model error or no model error. The simulation results under the two conditions show that the observer can estimate down-hole flow and pressure in real time rapidly and accurately.
Keywords:managed pressure drilling  dynamic model  nonlinear observer  state estimation  model error  
本文献已被 CNKI 等数据库收录!
点击此处可从《石油学报》浏览原始摘要信息
点击此处可从《石油学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号