首页 | 本学科首页   官方微博 | 高级检索  
     


New approximate algorithms for the customer order scheduling problem with total completion time objective
Affiliation:1. Institute for Integrated and Intelligent Systems (IIIS), Griffith University, Nathan, QLD 4111, Australia;2. School of Electrical Engineering and Computing, The University of Newcastle, Callaghan, NSW 2308, Australia
Abstract:In this paper, we study a customer order scheduling problem where a number of orders, composed of several product types, have to be scheduled on a set of parallel machines, each one capable to process a single product type. The objective is to minimise the sum of the completion times of the orders, which is related to the lead time perceived by the customer, and also to the minimisation of the work-in-process. This problem has been previously studied in the literature, and it is known to be NP-hard even for two product types. As a consequence, the interest lies on devising approximate procedures to obtain fast, good performing schedules. Among the different heuristics proposed for the problem, the ECT (Earliest Completion Time) heuristic by Leung et al. 6] has turned to be the most efficient constructive heuristic, yielding excellent results in a wide variety of settings. These authors also propose a tabu search procedure that constitutes the state-of-the-art metaheuristic for the problem. We propose a new constructive heuristic based on a look-ahead mechanism. The computational experience conducted shows that it clearly outperforms ECT, while having both heuristics the same computational complexity. Furthermore, we propose a greedy search algorithm using a specific neighbourhood that outperforms the existing tabu search procedure for different stopping criteria, both in terms of quality of solutions and of required CPU effort.
Keywords:Order scheduling  Completion times  Heuristics
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号