首页 | 本学科首页   官方微博 | 高级检索  
     

功果桥水电站工程库区移民集中安置点规划
引用本文:惠星. 功果桥水电站工程库区移民集中安置点规划[J]. 西北水电, 2011, 0(4): 64-67,87
作者姓名:惠星
作者单位:中国水电顾问集团西北勘测设计研究院,西安,710065
摘    要:以功果桥水电站库区移民集中安置点规划设计为例,探讨既解决移民实际需要,又创造宜居环境的社会主义新农村的规划设计思路。

关 键 词:功果桥水电站  库区  移民安置  规划设计

Planning of concentrated resettlement points for Gongguoqiao hydropower station
HUI Xing. Planning of concentrated resettlement points for Gongguoqiao hydropower station[J]. Northwest Water Power, 2011, 0(4): 64-67,87
Authors:HUI Xing
Affiliation:HUI Xing(Hydrochina Xibei Engineering Corporation,CHECC,Xi'an 710065,China)
Abstract:Taking the planning and design of concentrated resettlement points for Gongguoqiao hydropower station for example,the paper discusses the planning and design concept for solving the actual needs of resettlers and creating socialist new villages with livable environment.
Keywords:Gongguoqiao hydropower station  reservoir area  resettlement  planning and design  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号