首页 | 本学科首页   官方微博 | 高级检索  
     

工程量清单项目单价的评审方法
引用本文:王剑锋,万俊,黄有亮.工程量清单项目单价的评审方法[J].江苏建筑,2003(4):52-54,60.
作者姓名:王剑锋  万俊  黄有亮
作者单位:1. 东南大学土木学院,南京,210096
2. 南京河西建设公司,南京,210004
摘    要:本文针对目前招授标工作中只评授标总报价而忽视工程量清单项目单价的问题,介绍了一种评审工程量清单主要项目单价的方法和标准,为评标中选择最佳承包商提供决策依据。

关 键 词:工程量清单  单价  评审  工程招标  工程造价
文章编号:1005-6270(2003)04-0052-03

The Evaluation Method of Unit Rates in the Bill of Quantities
WANG Jian-feng WAN Jun HUANG You-liang.The Evaluation Method of Unit Rates in the Bill of Quantities[J].Jiangsu Construction,2003(4):52-54,60.
Authors:WANG Jian-feng WAN Jun HUANG You-liang
Affiliation:WANG Jian-feng WAN Jun HUANG You-liang
Abstract:In the light of the problem of only evaluating the total bid price and neglecting unit rates in the bill of quantities, this paper introduces one methodand standard of evaluating the main items rates in the bill of quantities. The research results of this paper provide decision basic to select the best contractor in the evaluation of bids.
Keywords:bill of quantities  main item  rate  evaluation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号