首页 | 本学科首页   官方微博 | 高级检索  
     

5.5m捣固焦炉煤塔结构缺陷治理与研究
引用本文:郭林,于永惟,刘素坤,岳大勇,张涛. 5.5m捣固焦炉煤塔结构缺陷治理与研究[J]. 燃料与化工, 2013, 0(3): 18-19
作者姓名:郭林  于永惟  刘素坤  岳大勇  张涛
作者单位:中冶焦耐工程技术有限公司
摘    要:5.5m捣固焦炉煤塔结构在设计和施工中存在问题,导致深梁底部向外挑出的“牛腿”出现竖向裂缝、振动给料器产生共振、脚手架支承系统失稳等现象。分析问题产生的原因,并通过对“牛腿”裂缝修补、增加剪力墙、改进脚手架支承系统等方法对结构缺陷进行有效的治理。

关 键 词:捣固焦炉  煤塔  脚手架支承系统  结构缺陷

Treatment and study of the structural defects for the coal tower of 5.5m stamp-charging battery
Guo Lin Yu Yongwei Liu Sukun Yue Dayong Zhang Tao. Treatment and study of the structural defects for the coal tower of 5.5m stamp-charging battery[J]. Fuel & Chemical Processes, 2013, 0(3): 18-19
Authors:Guo Lin Yu Yongwei Liu Sukun Yue Dayong Zhang Tao
Affiliation:Guo Lin Yu Yongwei Liu Sukun Yue Dayong Zhang Tao (ACRE Coking & Refractory Engineering Consulting Corporation,MCC,Dalian 116085,China)
Abstract:Due to the problems in the coal tower structure of 5.5m stamp-charging battery in design and construction, it gives rise to abnormalities, such as vertical cracks at brackets overhanging from the deep beam,vibration feeders resonation and imbalanced bracing systems of scaffold, etc.. This pa- per analyzes the causes of the problems and gives solutions such as mending bracket' s crack, adding shear wall and improving the bracing systems of scaffold, etc. for treatment of the structural defects.
Keywords:Stamp-charging coke oven  Coal tower  Support system of scaffold  Structural defect
本文献已被 CNKI 维普 等数据库收录!