首页 | 本学科首页   官方微博 | 高级检索  
     

CFG桩施工过程中孔隙水压力试验研究
引用本文:孙瑞民,杨凤灵,邓小涛.CFG桩施工过程中孔隙水压力试验研究[J].岩土工程学报,2009,31(11):1792-1798.
作者姓名:孙瑞民  杨凤灵  邓小涛
作者单位:华北水利水电学院;中国石油天然气管道工程有限公司珠海分公司
基金项目:河南省科技攻关项目(0524450008)
摘    要:长螺旋钻管内泵压CFG桩,是一项CFG桩复合地基新技术。该技术在郑州地区推广应用时,引起一系列环境岩土工程问题和桩体工程质量问题。所以探讨产生上述问题的机理和成因,提出解决问题的办法,对其适应性做出评价已迫在眉睫。孔隙水压力的变化是土体强度变化的前兆。通过在施工现场埋设孔隙水压力计,研究了长螺旋钻管内泵压CFG桩施工过程中,桩周饱和粉土中孔隙水压力的变化规律,探讨了施工引起桩周土体变形的机理。这为深入分析施工引起环境岩土工程问题的原因,进而采取有效措施,避免工程事故的发生提供了重要依据。更多还原

关 键 词:长螺旋钻管内泵压CFG桩    桩周土体    孔隙水压力    环境岩土工程  

Experimental study on pore water pressure in construction of CFG piles
SUN Rui-min,YANG Feng-ling,DENG Xiao-tao.Experimental study on pore water pressure in construction of CFG piles[J].Chinese Journal of Geotechnical Engineering,2009,31(11):1792-1798.
Authors:SUN Rui-min  YANG Feng-ling  DENG Xiao-tao
Affiliation:1.North China Institute of Water Conservancy and Hydroelectric Power,Zhengzhou 450011,China;2.Zhuhai Branch of China Petroblem Pipeline Engineering Corporation,Zhuhai 519015,China
Abstract: Pressure pumped CFG pile by continuous auger drilling is a new technology of CFG pile composite foundation.However,there appear a series of environmental geotechnical engineering problems and pile quality problems when this technology is applied and popularized in Zhengzhou and its peripheral regions.Therefore,it is urgent to study the mechanism and causes of the above problems as well as the solution to the problems and to assess their adaptation.Change of pore water pressure is the precursor of change of soil intensity.By burying pore water pressure gauges at the side of the piles,the variation discipline of the pore water pressure in saturated powder soil around piles is studied,and the mechanism of deformation displacement of soil body around piles caused by constructions during the process of construction of the pressure pumped CFG pile by continuous auger drilling is discussed.So it provides an important basis for deep analyses of the environmental and geotechnical engineering problems caused in construction.Effective measures should be taken to avoid engineering accidents. 
Keywords:pressure pumped CFG pile by continuous auger drilling  soil around pile  porewater pressure  environmental and geotechnical engineering
点击此处可从《岩土工程学报》浏览原始摘要信息
点击此处可从《岩土工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号