首页 | 本学科首页   官方微博 | 高级检索  
     


Dynamic production control in parallel processing systems under process queue time constraints
Authors:Cheng-Hung Wu  James T. Lin  Wen-Chi Chien
Affiliation:1. Institute of Industrial Engineering, National Taiwan University, 1, Section 4, Roosevelt Road, Taipei 106, Taiwan;2. Department of Industrial Engineering and Engineering Management, National Tsing Hua University, 101, Section 2, Kuang-Fu Road, Hsinchu 300, Taiwan
Abstract:This research examines the production control problems in two-station serial production systems under process queue time (PQT) constraints. In these serial production systems, all jobs must be processed at a fixed order in the upstream and downstream stations. There are multiple machines in both stations, and all machines are subject to random machine failures. In the downstream queue, the sum of waiting and processing time for each job is limited by an upper bound. This upper bound of time is called the PQT constraint. Violation of the PQT constraint causes high rework or scrap costs.
Keywords:Process queue time constraint   Production control   Parallel machines
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号