Dynamic production control in parallel processing systems under process queue time constraints |
| |
Authors: | Cheng-Hung Wu James T. Lin Wen-Chi Chien |
| |
Affiliation: | 1. Institute of Industrial Engineering, National Taiwan University, 1, Section 4, Roosevelt Road, Taipei 106, Taiwan;2. Department of Industrial Engineering and Engineering Management, National Tsing Hua University, 101, Section 2, Kuang-Fu Road, Hsinchu 300, Taiwan |
| |
Abstract: | This research examines the production control problems in two-station serial production systems under process queue time (PQT) constraints. In these serial production systems, all jobs must be processed at a fixed order in the upstream and downstream stations. There are multiple machines in both stations, and all machines are subject to random machine failures. In the downstream queue, the sum of waiting and processing time for each job is limited by an upper bound. This upper bound of time is called the PQT constraint. Violation of the PQT constraint causes high rework or scrap costs. |
| |
Keywords: | Process queue time constraint Production control Parallel machines |
本文献已被 ScienceDirect 等数据库收录! |
|