首页 | 本学科首页   官方微博 | 高级检索  
     


SCGM(1, m )c model with time-lag and its application in deformation analysis
Authors:Li Zhi-wei    Li Tao    Zhu Jian-jun   Wang Ren-qian
Affiliation:(1) College of Resources, Environment and Civil Engineering, Central South University, 410083 Changsha, China;(2) Department of Civil Engineering, Huaqiao University, 350029 Quanzhou, China
Abstract:Originated in the early 1990s, SCGM(1,m)c model has enjoyed widespread application in the fields of urban planning, society economy prediction and modal control in recent years. However, none of these applications have taken account of time-lag effects in the modeling process. Aiming at overcoming the defect, the authors introduced time-lag items into SCGM(1,m)c model and developed a SCGM(1,m)c model with time-lag, then discusses in detail some principal problems in the model, such as parameters estimation, model verifying, model prediction, etc. The model was used on a real slope monitoring project and compared with the conventional SCGM(1,m)c model. The results show an improvement of average models precision from 1.321 to 0.238 and total average of relative prediction errors from 12.41% to 7.98% when the modeling data length ranges from 29 to 48 in the slope monitoring case. Foundation item: The National Natural Science Foundation of China(No. 49774209) Biography of the first author: LI Zhi-wei, doctoral student, born in Aug. 1974, majoring in surveying data processing, synthetic aperture radar interferometry.
Keywords:grey system  SCGM(1,m)c   time-lag  deformation analysis
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号