海控国际广场外框型钢混凝土柱变更为钢管混凝土柱的设计与施工分析
引用本文:王永年,张磊,赵海兴,田卫国. 海控国际广场外框型钢混凝土柱变更为钢管混凝土柱的设计与施工分析[J]. 施工技术, 2012, 41(18): 50-53
作者姓名:王永年  张磊  赵海兴  田卫国
作者单位:1. 中建钢构有限公司,广东深圳,518040
2. 中国建筑第六工程局有限公司,天津,300451
基金项目:中建股份有限公司科研项目:海岛环境高烈度区超高层组合结构综合施工技术研究与应用
摘    要:钢管混凝土柱技术作为目前超高层钢结构建筑主要采用的结构形式,已日趋成熟,在各地的超高层建筑中得到广泛利用。海控国际广场A座原设计外框结构为型钢混凝土柱,后变更为矩形钢管混凝土柱。对比分析了型钢混凝土柱和钢管混凝土柱截面参数、受力特征、节点等设计和施工指标。对比结果证明钢管混凝土柱使结构受力更可靠,抗震性能更强,特别是减少了施工工序,施工更方便快捷。地上主体外框结构共计52层,钢结构施工工期仅280d,其中第31~50层达到3d/层的施工速度。实践证明,采用钢管混凝土柱,设计与施工方面均为最优方案,可取得较好的经济效益。

关 键 词:高层建筑  钢管混凝土柱  型钢混凝土柱  设计  施工

Analysis on Design and Construction of Concrete Filled Steel Tubular Columns Instead of Section Steel Concrete Columns in HNA International Mansion
Wang Yongnian , Zhang Lei , Zhao Haixing , Tian Weiguo. Analysis on Design and Construction of Concrete Filled Steel Tubular Columns Instead of Section Steel Concrete Columns in HNA International Mansion[J]. Construction Technology, 2012, 41(18): 50-53
Authors:Wang Yongnian    Zhang Lei    Zhao Haixing    Tian Weiguo
Affiliation:1.China Construction Steel Structure Co.,Ltd.,Shenzhen,Guangdong 518040,China; 2.China Construction Sixth Engineering Division Co.,Ltd.,Tianjin 300451,China)
Abstract:Concrete filled steel tubular columns,as the main technology applied to the ultra-high-rise steel buildings,have become more mature,which is fully used in high-rise buildings.The original design of frame structure in the tower A of HNA International Mansion was to use section steel concrete columns.However,it was changed to employ the rectangular concrete filled steel tubular columns after comparing the design data of section parameters,bearing capacity,joints and construction data.It shows that the concrete filled steel tubular columns are more reliable,especially in the seismic performance.Besides,it particularly simplifies the construction process to make the construction more convenient.For the main frame with a total of 52 floors above ground,the steel construction period of only 280 days is achieved.For the layers 31~50,a construction speed of three days a layer is even reached.It has proved that adopting the concrete filled steel tubes is the optimal solution in aspect of both design and construction with better economic benefits.
Keywords:tall buildings  concrete filled steel tubular column  section steel concrete column  design  construction