ANALYSIS AND IMPROVEMENT OF LEAD TIME FOR JOB SHOP UNDER MIXED PRODUCTION SYSTEM
Authors:CHE Jianguo HE Zhen EDWARD M Knod
Affiliation:[1]Department of Industrial Engineering, Tianjin University, Tianjin 300072, China [2]Department of Management,Western Illinois University, Macomb 61466, USA
Abstract:Firstly an overview of the potential impact on work-in-process (WIP) and lead time is provided when transfer lot sizes are undifferentiated from processing lot sizes. Simple performance examples are compared to those from a shop with one-piece transfer lots. Next, a mathematical programming model for minimizing lead time in the mixed-model job shop is presented, in which one-piece transfer lots are used. Key factors affecting lead time are found by analyzing the sum of the longest setup time of individual items among the shared processes (SLST) and the longest processing time of individual items among processes (LPT). And lead time can be minimized by cutting down the SLST and LPT. Reduction of the SLST is described as a traveling salesman problem (TSP), and the minimum of the SLST is solved through job shop scheduling. Removing the bottleneck and leveling the production line optimize the LPT. If the number of items produced is small, the routings are relatively short, and items and facilities are changed infrequently, the optimal schedule will remain valid. Finally a brief example serves to illustrate the method.
Keywords:Lead time  Work-in-process(WIP)  Mixed production system  Job shop scheduling problem  Traveling salesman problem(TSP)
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号