首页 | 本学科首页   官方微博 | 高级检索  
     

蒸发器的设计、安装及试压
引用本文:金鑫,赵经禄.蒸发器的设计、安装及试压[J].化工矿物与加工,2004,33(4):25-27.
作者姓名:金鑫  赵经禄
作者单位:连云港农机监理所,江苏,连云港,222000;化工部连云港设计研究院,江苏,连云港,222004
摘    要:双效蒸发系统在安装过程中,由于设备庞大超重,无法进行水压试验,因此本设计通过工艺参数调整,将压力容器操作改为常压容器操作,进行了气密性试验.验证了设备的安全可靠性。

关 键 词:水压试验  气压试验  气密性试验
文章编号:1008-7524(2004)04-0025-03
修稿时间:2003年2月8日

Design, installation and pressure test of evaporator
JIN Xin,ZHAO Jing-lu.Design, installation and pressure test of evaporator[J].Industrial Minerals and Processing,2004,33(4):25-27.
Authors:JIN Xin  ZHAO Jing-lu
Affiliation:JIN Xin~1,ZHAO Jing-lu~2
Abstract:During the installation of double effective evaporation system, the water pressure test for the system couldn't be made, because that the equipment was very big. On the basis of adjusting process parameters in the design, the operation of pressure container was changed into the operation of ordinary pressure container. The air-tight test of the evaporator was carried out to verify its safety and reliability.
Keywords:water pressure test  air pressure test  air-tight test
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号