首页 | 本学科首页   官方微博 | 高级检索  
     

黄河水资源利用现状,预测及对策
引用本文:侯传河. 黄河水资源利用现状,预测及对策[J]. 人民黄河, 1996, 18(5): 1-6
作者姓名:侯传河
作者单位:黄委会勘测规划设计研究院
摘    要:人民治黄以来,黄河流域修建了大量的蓄,引,提水工程,为黄河水资源的开发利用创造了良好的条件,1990年流域工农业总引用水478亿m^3其中地下水114亿m^3,河川水364亿m^3,用水量最多的是农业灌溉,工业及生活用水比重较小,据分析,2000年水平全流域总需水量640亿m^3年供水量为620亿m^3,缺水20亿m^3,2010年水平全流域总需水量为723亿m^3,在满足下游输水入海用水条件下,

关 键 词:水资源 供需分析 预测 黄河

Water Resource Utilization, Calculation and Countermeasure in Yellow River
Bai Shaoxi,Hou Chuanhe,et al.. Water Resource Utilization, Calculation and Countermeasure in Yellow River[J]. Yellow River, 1996, 18(5): 1-6
Authors:Bai Shaoxi  Hou Chuanhe  et al.
Abstract:here have been a lot of projects built of water storage,diversion works and drawingwater in Yellow River Basin since the people started to hamers the river, which have createdfavourable condition for the water resource development and utilization in Yellow River. The totalwater consumption in industry,agriculture and daily use was 47, 800 million cubic meters in 1990with most volume in agriculture and comparatively less part in industry and living use,in whichunderground water was 11 , 400 million cubic meters and surface water of 36, 400 million cubic meters. According the analysis,the whole basin of Yellow River will need water supply of 64, 000million cubic meters, and the average annual water supply from the river will be 62,000 millioncubic meters under the consideration of surface and underground water supply;which will basically meet the demands j the water need will be 72, 300 million cubic meters in 2010 and there will bea,shortage of 6, 900 million cubic meters under the circumstances of given enough water for delivery of the sediment in lower reaches into the sea,water resource will be the main factor restrictingthe economics development in the area. The countermeasures to settle the contradiction of waterresource supply and demands are as follows:building key projects in the main stream;saving water in all-over aspects;popularization of dry planting agriculture; strengthing water environmentprotectionl construction of diversion from Yangtz River in western line.
Keywords:Water resource  analysis of supply and demand  present conditions   estimation    countermeasures   Yellow River.  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号