横江水库土坝渗水原因分析及处理措施
引用本文:谭福林. 横江水库土坝渗水原因分析及处理措施[J]. 广东水利电力职业技术学院学报, 2008, 6(3): 77-80
作者姓名:谭福林
作者单位:韶关市水利水电建设公司,广东韶关,512026
摘    要:横江水库长期处于限制蓄水、 "带病"运行状态.只有对渗水原因进行分析、解决土坝的变形和渗透等问题,才能最终达到除险加固之目的.

关 键 词:横江水库  渗水  处理

Analysis of the Reasons of Heng Jiang Reservoir Earth Dam's Seepage and the Processing Measures
TAN Fu-lin. Analysis of the Reasons of Heng Jiang Reservoir Earth Dam's Seepage and the Processing Measures[J]. Journal of Guangdong Technical College of Water Resources and Electric Engineering, 2008, 6(3): 77-80
Authors:TAN Fu-lin
Affiliation:TAN Fu-lin(Shaoguan Water Resource , Hydropower Construction Company,Shaoguan 512026,China)
Abstract:The Heng Jiang reservoir is at the limit storage for a long time,and running regardless its danger.Only after the seep rea-sons have been analyzed and problems such as earth dam distortion and seepage been solved,the goal to eliminate the danger and re-inforce the dam can be finally achieved.
Keywords:Heng Jiang reservoir  seep  processing  