Deterministic job-shop scheduling problems with capacity focus |
| |
Authors: | W. K. Heuser |
| |
Affiliation: | 1. Research Information Technics, Daimler-Benz AG, Wilhelm Runge Strasse 11, 89081, Ulm, Federal Republic of Germany
|
| |
Abstract: | In this paper a main point of view is the exhausting of capacity in relation to a capacity focus at every node of the production graph. This exhausting process has a local and a global aspect. Optimality means a homogeneous reservation of the production nets and exhaustion of the capacity in the nodes close to the focus. Under weak conditions an optimal production sequence is achievable constructively. A classical field of application of this result is the assembly, but many other applications are possible. |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |
|