东风水电站的工程地质评价及初步检验
引用本文:谢树庸. 东风水电站的工程地质评价及初步检验[J]. 水力发电, 1994, 0(12): 23-27
作者姓名:谢树庸
作者单位:贵阳勘测设计研究院
摘    要:东风水电站存在着岩溶渗漏、岩溶地基与围岩的稳定、岩溶涌水、岩溶区水库诱发地震和高坡稳定等多种地质问题,比较复杂。经过勘测部门四进四出工地,才查明了电站的工程地质条件,从而为工程施工创造了条件,开挖实践证明,勘测成果是好的。

关 键 词:水电站 工程地质 地质条件 初步检验

Engineering Geological Evaluation and Its Preliminary Test in Dongfeng Hydropower Station
Xie Shuyong. Engineering Geological Evaluation and Its Preliminary Test in Dongfeng Hydropower Station[J]. Water Power, 1994, 0(12): 23-27
Authors:Xie Shuyong
Abstract:In Dongfeng Hydropower Station, there exist many kinds of complex geological problems such as karst seepage, stability of the karst foundation and the surrounding rock, karst surge water, reservoir induced earthquake in karst zones, and stability of high landslope. The results of investigating engineering geological conditions have created a good condition for commencing the construction. Actual excavation proved that the results of the investigation are good.
Keywords:Dongfeng Hydropower Station   Geological conditions   Geological evaluation   engineering treatment