Abstract: | The paper develops a technique to predict life-cycle costs, using probabilistic information about the likelihood and extent of corrosion-induced cracking to reinforced concrete (RC) structures. The present paper focuses on the likelihood and extent of severe cracking as the criterion for the timing and cost of maintenance. The life-cycle cost and expected maintenance cost considers multiple repairs and various inspection intervals over the service life of the structural element. A repair cost function is also developed. Two common maintenance strategies are considered: repair and rehabilitation. It was found that for a 2% discount rate the benefits of delaying the timing of repairs outweigh the cost of increased extent of damage, for maintenance of a RC bridge deck. |