首页 | 本学科首页   官方微博 | 高级检索  
     

电站群非劣开发顺序多目标决策评价方法
引用本文:罗志辉,陈惠源,冯尚友.电站群非劣开发顺序多目标决策评价方法[J].水电能源科学,1999,17(2):24-26,30.
作者姓名:罗志辉  陈惠源  冯尚友
作者单位:1. 湖南师范大学
2. 武汉水利电力大学
摘    要:用动态投入产出模型作为非劣电站开发顺序的区域经济系统响应的模拟分析模型;讨论了模型求解的关键技术-投资产品向量生成技术。采用层次分析法评价非劣序的区域经济系统响应之优劣,并藉此筛选最佳权衡解。

关 键 词:决策评价  系统响应  动态投入产出

The Multi-Objective Decision-making and Evaluation Methods for the Noninferior Development Sequence of Power Plants
Luo Zhihui,Chen Huiyuan.The Multi-Objective Decision-making and Evaluation Methods for the Noninferior Development Sequence of Power Plants[J].International Journal Hydroelectric Energy,1999,17(2):24-26,30.
Authors:Luo Zhihui  Chen Huiyuan
Affiliation:Luo Zhihui; Chen Huiyuan
Abstract:A general dynamic I/O model, which is the analysis model to simulate the regional economy system for the noninferior development sequence of power plants is proposed. And how to generate the vector of investment production, which is the key technique of dealing with dynamic I/O modelis discussed. AHP is adopted to evaluate the response of regional economy system and based on it theoptimal trade-off solution could be chosen.Luo Zhihui Ph. D.; Hunan Normal University, Changsha 410081,China.
Keywords:decision-making and evaluation  system response  dynamic input/output
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号