首页 | 本学科首页   官方微博 | 高级检索  
     

大型供水系统水泵启动水锤分析
引用本文:沈正. 大型供水系统水泵启动水锤分析[J]. 人民珠江, 2000, 0(1): 9-11
作者姓名:沈正
作者单位:珠江水利委员会科研所,广东,广州,510611
摘    要:以九江电厂供水系统为例,对大型供水系统启动水锤事故利用水锤分析的数学模型进行计算机仿真,找出了事故发生的原因,提出了防护对策,并对大型供水系统设计、运行的有关问题进行研究与分析。

关 键 词:供水系统 水锤 计算机仿真 水泵
文章编号:1001-9235(2000)01-0009-03

Analysis of Starting Water Hammer of Pumps in Large Water Supply System
SHEN Zheng. Analysis of Starting Water Hammer of Pumps in Large Water Supply System[J]. Pearl River, 2000, 0(1): 9-11
Authors:SHEN Zheng
Affiliation:SHEN Zheng ;(Scientific Research Institute of PRWRC, Guangzhou 510611, China)
Abstract:Taking the water supply system of Jiujiang Power Plant as an example, the author carries out computerization emulation for starting water hammer accident of large water supply system by means of mathemactic model to find out the causes of accident and puts forward safeguarding measures. The author also conducts study and analysis on problems relevant to design and operation of large water suply system.
Keywords:water supply system  water hammer  computerization emulation  
本文献已被 CNKI 维普 万方数据 等数据库收录!