岩滩水电站扩建工程转轮模型验收试验
引用本文:黄显文,戴金芬. 岩滩水电站扩建工程转轮模型验收试验[J]. 红水河, 2014, 0(2): 44-47
作者姓名:黄显文  戴金芬
作者单位:大唐岩滩水力发电有限责任公司
摘    要:岩滩水电站扩建工程转轮借鉴一期转轮运行及改造经验进行选取,并根据工程特点进一步优化。选取的转轮经过模型验收试验,数据符合甚至优于合同要求。原型转轮在运行中表现良好。

关 键 词:水轮机  模型试验  岩滩水电站扩建工程

Runner Model Acceptance Test for Extension Project of Yantan Hydropower Station
HUANG Xian-wen;DAI Jin-fen. Runner Model Acceptance Test for Extension Project of Yantan Hydropower Station[J]. Hongshui River, 2014, 0(2): 44-47
Authors:HUANG Xian-wen  DAI Jin-fen
Affiliation:HUANG Xian-wen;DAI Jin-fen;Datang Yantan Hydropower Co., Ltd.;
Abstract:The runner for the Extension Project of Yantan Hydropower Station was selected according to the experi- ences of first-stage runner operation and innovation and was further optimized based on the characteristic of the Ex- tension Project. The model acceptance test results proved that the selected runner has very good performance. The prototype runner works well in operation.
Keywords:turbine  model test  Extension Project of Yantan Hydropower Station