首页 | 本学科首页   官方微博 | 高级检索  
     

广西水利电力勘测设计研究院国际项目回顾
引用本文:卢广.广西水利电力勘测设计研究院国际项目回顾[J].广西水利水电,2014(5):128-131.
作者姓名:卢广
作者单位:广西水利电力勘测设计研究院,广西 南宁,530023
摘    要:结合工程实例,从引进设备、国际技术合作、走进国际市场3个阶段回顾了广西水利电力勘测设计研究院建院以来国际合作经历,总结国际技术交流合作经验与效果。

关 键 词:引进设备  国际  项目  合作  国际市场  回顾

Review of international projects of Guangxi Water and Power Design Institute
LU Guang.Review of international projects of Guangxi Water and Power Design Institute[J].Gx Water Resources & Hydropower Engineering,2014(5):128-131.
Authors:LU Guang
Affiliation:LU Guang (Guangxi Water and Power Design Institute, Nanning 530023, China)
Abstract:Combined with real projects, a review was made on the three stages of Guangxi Water and Power Design Institute participating international cooperation, including import equipment stage, international technical cooperation stage and entering international market stage. The author also summarized experience and effects of international technical exchange and cooperation.
Keywords:Import equipment  international  project  cooperation  international market  review
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号