1 000 kV变压器带局部放电测量的长时感应耐压现场试验
引用本文:胡晓岑,贺虎,连建华,张永春,秦旭岗.1 000 kV变压器带局部放电测量的长时感应耐压现场试验[J].电网技术,2009,33(10):41-45.
作者姓名:胡晓岑  贺虎  连建华  张永春  秦旭岗
作者单位:胡晓岑,连建华,张永春,秦旭岗,HU Xiaocen,LIAN Jianhua,ZHANG Yongchun,QIN Xugang(山西省电力公司电力科学研究院,山西省,太原市,030001);贺虎,HE Hu(国网交流工程建设有限公司,北京市,西城区,100140)  
摘    要:1 000 kV晋东南—南阳—荆门特高压交流试验示范工程是我国目前电压等级最高的输变电工程,其现场交接试验关系到整个工程是否顺利投运。文章研究了特高压晋东南变电站1 000 kV变压器带局部放电测量的长时感应耐压现场试验,介绍了试验的标准、程序、试验方法以及主要试验设备参数的选择,提出了综合抗干扰措施和过程监测技术手段,确保了试验的顺利进行,为特高压交流变压器的顺利投运提供了有力的技术保障。

关 键 词:1  000  kV主变压器  感应耐压试验  局部放电  现场试验
收稿时间:2009-04-02
修稿时间:2009-04-20

On-Site Long-Duration Induced AC Voltage Withstand Test With Partial Discharge Measurement of 1 000 kV Transformer
HU Xiao-cen,HE Hu,LIAN Jian-hua,ZHANG Yong-chun,QIN Xu-gang.On-Site Long-Duration Induced AC Voltage Withstand Test With Partial Discharge Measurement of 1 000 kV Transformer[J].Power System Technology,2009,33(10):41-45.
Authors:HU Xiao-cen  HE Hu  LIAN Jian-hua  ZHANG Yong-chun  QIN Xu-gang
Affiliation:1.Electric Power Research Institute;Shanxi Provincial Electric Power Corp.;Taiyuan 030001;Shanxi Province;China;2.State Grid AC Project Construction Co.;Ltd.;Xicheng District;Beijing 100140;China
Abstract:The 1 000 kV power transmission pilot project from Southeast Shanxi via Nanyang to Jingmen is the power transmission and transformation project with the highest voltage class in China, and the results of its on-site handover tests directly relate to whether the whole project could be put into operation without a hitch. In this paper, the on-site long-duration induced ac voltage withstand test with partial discharge measurement of 1 000 kV transformer is researched; the standard, procedures, test methods and parameter selection of main testing devices are presented. The comprehensive anti-interference measures and technological means for process monitoring are proposed during the on-site tests to ensure the tests could be carried out smoothly and offer powerful technical support to successfully put 1 000 kV main transformer into operation.
Keywords:1 000 kV main transformer  induced AC voltage withstand test  partial discharge  on-site test