首页 | 本学科首页   官方微博 | 高级检索  
     

超低渗储层混合水体积压裂重复改造技术研究与现场试验
引用本文:李建山,陆红军,杜现飞,齐银,顾燕凌,史成恩,令永刚.超低渗储层混合水体积压裂重复改造技术研究与现场试验[J].石油与天然气化工,2014,43(5):515-520.
作者姓名:李建山  陆红军  杜现飞  齐银  顾燕凌  史成恩  令永刚
作者单位:1. 中国石油长庆油田公司超低渗透油藏研究中心
2. 中国石油长庆油田公司超低渗透油藏第二项目部
基金项目:国家科技重大专项“超低渗透油藏有效开采技术”(2011ZX05013-004)。
摘    要:以华庆油田为代表的超低渗透油藏定向井单井产量低,日产量小于1.0t的低产低效井占56.2%。常规重复压裂压裂后的油井增产效果不理想,具体表现在压裂后增产幅度小、产量递减速度快、有效期短。针对长庆油田华庆区块超低渗透储层油井的重复改造,将混合水体积压裂技术应用于老井重复压裂中,形成了老井混合水体积压裂配套工艺技术,并在考虑井网和注水条件下,进行体积压裂理论与多级暂堵多缝压裂理论的结合研究。室内工艺优化结果和9口井的现场试验表明,措施后油井的平均单井日增油量2.81t。截至目前,平均单井有效生产天数达252天,增产效果显著。该技术的成功实施运用,为超低渗透油藏重复压裂效果的提高提供了有力的依据。

关 键 词:重复压裂  体积压裂  混合水压裂  增产机理  多级暂堵
收稿时间:2014/1/10 0:00:00

Re-fracturing technology research and field application of mixing water volume fracturing in ultra-low permeability reservoir
Li Jianshan,Lu Hongjun,Du Xianfei,Qi Yin,Gu Yanling,Shi Chengen,Ling Yonggang.Re-fracturing technology research and field application of mixing water volume fracturing in ultra-low permeability reservoir[J].Chemical Engineering of Oil and Gas,2014,43(5):515-520.
Authors:Li Jianshan  Lu Hongjun  Du Xianfei  Qi Yin  Gu Yanling  Shi Chengen  Ling Yonggang
Affiliation:Li Jianshan;Lu Hongjun;Du Xianfei;Qi Yin;Gu Yanling;Shi Cheng’en;Ling Yonggang;Research Center for Ultra-low Permeability Reservoirs of PetroChina Changqing Oilfield Company;No.2 Project Department for Ultra-low Permeability Reservoirs of PetroChina Changqing Oilfield Company;
Abstract:Single well has low yield in Huaqing low permeability oilfield.The wells with daily output less than 1tons account for a larger proportion of total wells,reaching 56.2%in Huaqing Oilfield.Re-fracturing is an important measure to improve the production of fractured wells in Changqing ultra-low permeability reservoirs.Currently,the re-fracturing well stimulation is not ideal by using the conventional technologies.The performances such as small yield increase,water cut rising,production decline suddenly,short increasing period are appeared after re-fracturing.In this paper,the hybrid slick water SRV and multi-stage temporary blocking fracturing are combined to work for old production wells in ultra-low permeability reservoirs.Considering the well pattern and injection well conditions,the theories of volumetric fracturing and multi-stage temporary blocking are combined.After the parameters optimization in the laboratory and application of nine wells in the field,the average single well daily output increased 2.81 t,the effective production period for average single well is up to 252 days,and the effect of increasing yield is significant.The successful application of this technique also provides a strong basis for the refracturing in ultra-low permeability reservoir.
Keywords:re-fracturing  volume fracturing  mixing water fracturing  increase production mechanism
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《石油与天然气化工》浏览原始摘要信息
点击此处可从《石油与天然气化工》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号