首页 | 本学科首页   官方微博 | 高级检索  
     

电子延迟器控制的三级震源叠加技术
引用本文:刘海平,刘慧敏,王海涛. 电子延迟器控制的三级震源叠加技术[J]. 石油地球物理勘探, 2021, 56(2): 217-225. DOI: 10.13810/j.cnki.issn.1000-7210.2021.02.001
作者姓名:刘海平  刘慧敏  王海涛
作者单位:1. 山西省煤炭地质物探测绘院地质与地球物理研究所, 山西晋中 030600;2. 山西金地源地质科技有限公司, 山西晋中 030600;3. 大秦铁路股份有限公司侯马电务段, 山西侯马 043000
基金项目:本项研究受山西省煤炭地质局科技项目"地震勘探精准控制爆炸延迟器研发"(晋煤地发[2018]12号)资助。
摘    要:在厚黄土层地表区地震数据采集中,多级延迟叠加震源方法具有先进性,但现今采用机械武打击片或螺旋式导爆管控制震源延时爆炸的方法,存在延时精度低、结构复杂、加工成本高及效率低等问题.使用电子雷管虽可较精准实现多级震源延迟叠加,但由于费用过高而难以大规模使用.文中介绍一种电子延迟技术控制多级震源叠加的方法,并详述地表控制电路(...

关 键 词:多级延迟叠加震源  电子延迟技术  有效波  能量  频带
收稿时间:2020-08-01

Electronic delayer-controlled three-stage seismic sources superposition
LIU Haiping,LIU Huimin,WANG Haitao. Electronic delayer-controlled three-stage seismic sources superposition[J]. Oil Geophysical Prospecting, 2021, 56(2): 217-225. DOI: 10.13810/j.cnki.issn.1000-7210.2021.02.001
Authors:LIU Haiping  LIU Huimin  WANG Haitao
Affiliation:1. Coal Geological Geophysical Exploration Surveying & Mapping Institute of Shanxi Province, Jinzhong, Shanxi 030600, China;2. Geological Technology Limited Company of Shanxi Jindiyuan, Jinzhong, Shanxi 030600, China;3. Houma Electric Depot of Daqin Railway Limited by Share Led, Houma, Shanxi 043000, China
Abstract:Multi-stage delay stacked source is advanced for seismic data acquisition in thick loess area. However, using a mechanical striker or a screw-type detonating tube to delay the explosion of seismic sources, there are many problems, such as low accuracy of time delay, high cost, complex structure and low efficiency. Although such delay can be achieved by using an advanced electronic detonator, it has not been widely used because of high cost. In this paper, we introduce a method of controlling the delayed explosion of seismic sources using an electronic delay technology, and give the schematic of the control circuit on the surface (referred to as a high-voltage encoder) and the delay circuit under the ground (referred to as a delayer). It is a new type of explosion system controlled by a multi-stage seismic source circuit. Taking the exploration project in Shanxi Province, we tested the system. The results show that the system can stably control three explosive columns to detonate from top to bottom accurately. The distance between the explosive columns is 1.7m, and the detonating time differs by 3ms. Keeping hole depth, charge size, receiver patch and folds constant, from the point of shot static correction record, the effective reflection energy of vertical delay three-magnitude source is strong than that of plane three-combination source in, the frequency band of the former is wider, the surface wave of the former is weaker and the exploration cost of the former is lower than the latter; from the point of seismic time section, the effective reflection energy and frequency band of vertical delay three-magnitude seismic source are equivalent to plane five-combination seismic source,and the cost of the former is reduced by about 70% to 80% on the latter. The multi-stage delay stacking method is useful for exploring coal and oil resources in the thick loess area.
Keywords:multi-stage delay stack source  electronic time delay technology  effective reflected wave  energy  frequency band  
点击此处可从《石油地球物理勘探》浏览原始摘要信息
点击此处可从《石油地球物理勘探》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号