宝珠寺水电站混凝土工程施工综述
引用本文:曹麦云.宝珠寺水电站混凝土工程施工综述[J].四川水力发电,1997,16(3):16-21,27.
作者姓名:曹麦云
作者单位:中国水利水电第五工程局!四川广元,628003
摘    要:宝珠寺水电站混凝土工程自开工以来,不断优化施工设计,推广应用新技术,新工艺,加快了施工进度,现工程施工正在按总进度要求顺利实施。本文主要介绍工程概况,施工布置,大坝与厂房混凝土施工。

关 键 词:混凝土工程  施工布置  大坝  厂房  水电站

Summary of Concreting Works at Baozhusi Hydropower Station
Cao Maiyun.Summary of Concreting Works at Baozhusi Hydropower Station[J].Sichuan Water Power,1997,16(3):16-21,27.
Authors:Cao Maiyun
Abstract:Since the Concreting had started at Baozhusi hydropower station,construction design has been optimized,new technology and techniques has been spread and used,construction advances has accelerated. At present,project construction is going on smoothly according to general construction schedule. General conditions of project,construction plan,concreting at dam and powerhouse are mainly introduced in this paper.
Keywords:concreting  construction plan  general schedule of concreting at dam and powerhouse  construction