首页 | 本学科首页   官方微博 | 高级检索  
     


Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints
Authors:Hong Zhang  Heng Li  C. M. Tam
Affiliation:1Lecturer, Dept. of Building and Construction, City Univ. of Hong Kong, Tat Chee Ave., Kowloon, Hong Kong.
2Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong.
3Professor, Dept. of Building and Construction, City Univ. of Hong Kong, Tat Chee Ave., Kowloon, Hong Kong.
Abstract:This paper introduces a particle swarm optimization (PSO)-based methodology to implement preemptive scheduling under break and resource-constraints (PSBRC) for construction projects. The PSBRC under study allows the preemptive activities to be interrupted in off-working time and not to resume immediately in the next working period because all the limited resources are to be reallocated during a break. The potential solution to the PSBRC, i.e., a set of priorities deciding the order to start the activities or restart the interrupted activities, is represented by the multidimensional particle position. Hence PSO is applied to search for the optimal schedule for the PSBRC, in which a parallel scheme is adopted to transform the particle-represented priorities to a schedule. Computational analyses are presented to verify the effectiveness of the proposed methodology. This paper provides an attempt to make use of preemption and break for the resource-constrained construction project with the objective of minimizing project duration.
Keywords:Optimization  Scheduling  Construction management  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号