首页 | 本学科首页   官方微博 | 高级检索  
     

基于模糊积分的绿色工艺规划综合评判
引用本文:秦少军. 基于模糊积分的绿色工艺规划综合评判[J]. 制造技术与机床, 2001, 0(10): 14-15
作者姓名:秦少军
作者单位:宝鸡文理学院机械工程系
摘    要:实施绿色制造的基础是确定绿色工艺规律。文中运用模糊积分建立了绿色工艺规划综合评判模型,采用两级评判方法解决了工艺规划中多影响因素的评判及工艺规划方案选择问题,并以实例说明了其可行性。

关 键 词:绿色制造 工艺规划 模糊积分 综合评判
修稿时间:2001-04-28

Comprehensive Evaluation on A Green-Process Program Based on Fuzzy Integral
QIN Shaojun. Comprehensive Evaluation on A Green-Process Program Based on Fuzzy Integral[J]. Manufacturing Technology & Machine Tool, 2001, 0(10): 14-15
Authors:QIN Shaojun
Abstract:The base for implementing green manufacture is to determine the green process program. A comprehensive eva_ luating model for green process program was set up by using fuzzy integral, a two-stage evaluation was used for assessing several influencing factors for process planning and for selecting process planning scheme, and examples were used to demonstrate its feasibility.
Keywords:Green Manufacturing   Process Program   Fuzzy Integral   Comprehensive Evaluation
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号