首页 | 本学科首页   官方微博 | 高级检索  
     

谈清单计价与定额计价的异同
引用本文:冯振荣.谈清单计价与定额计价的异同[J].山西建筑,2005,31(4):150-151.
作者姓名:冯振荣
作者单位:太原城市给水工程建设处
摘    要:针对我国建设工程计价模式现状,结合工程量清单计价规范,分别从定价原则、造价构成、计价过程等方面,就清单计价与定额计价的异同进行了分析,指出清单计价在我国还需要一个适应和完善的过程。

关 键 词:工程量清单计价  定额计价  计价模式
文章编号:1009-6825(2005)04-0150-02
修稿时间:2004年11月13

Similarities and differences between engineering bill pricing and fixed quota pricing
FENG Zhen-rong.Similarities and differences between engineering bill pricing and fixed quota pricing[J].Shanxi Architecture,2005,31(4):150-151.
Authors:FENG Zhen-rong
Abstract:According to present project-pricing mode in our country and codes of engineering bill pricing the similarities and differences between engineering bill pricing and fixed quota pricing are analyzed from pricing principle, components of cost and other aspects. Author points out that the pricing mode based upon engineering quantity list needs an adaptive and perfect process in China.
Keywords:engineering bill pricing  fixed quota pricing  pricing mode
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号