摘    要:对电力系统中有限个数目PMU的优化配置进行研究。采用分段迭代法对PMU的优化配置进行研究。该法假设最初每个节点均安装有PMU。第一阶段和第二阶段的迭代算法用来去除那些不太重要的节点的PMU配置,并保留节点位置重要的PMU的配置。第三阶段的迭代算法则对前两阶段的PMU数目进行进一步的最小化,并且充分考虑电力系统全网的可观性,使得该法达到PMU的最优配置。通过在IEEE 14和IEEE 30节点上进行仿真验证,并与现有的优先算法在计算时间上进行对比,证明该法在计算时间上的优越性,及该法的有效性。

关 键 词:PMU  迭代算法  IEEE节点系统  优化配置  可观性
收稿时间:2015-03-27
修稿时间:2015-04-09

Research on optimal PMU allocation based on section iterative method
Zhao Hui,ZHAO Shaohu,WANG Hongjun and YUE Youjun. Research on optimal PMU allocation based on section iterative method[J]. Electrical Measurement & Instrumentation, 2016, 53(13): 14-18. DOI: 10.3969/j.issn.1001-1390.2016.13.004
Authors:Zhao Hui  ZHAO Shaohu  WANG Hongjun  YUE Youjun
Affiliation:Tianjin Key Laboratory for Control Theory and Application in Complicated System Tianjin University of Technology,Tianjin,Tianjin Key Laboratory for Control Theory and Application in Complicated System Tianjin University of Technology,Tianjin,Tianjin Key Laboratory for Control Theory and Application in Complicated System Tianjin University of Technology,Tianjin,Tianjin Key Laboratory for Control Theory and Application in Complicated System Tianjin University of Technology,Tianjin
Abstract:This paper conduct the research on the optimal allocation of a limited number of PMU in power system de-vice.A three-stage method will be adopted to study theoptimal allocation of PMU.The method assumes that each bus is installed with PMU initially.The first stage and the second stage of iterative algorithmis are used to remove those less important buses of the PMU configuration, and keep the important position of the buses PMU configuration.The third stage of iterative algorithm makes a further minimize of the first stage and the second stage, and considering the observability of power system, to ensure the optimal configuration of PMU.According to the simulation verification on IEEE 14 bus and IEEE 30 bus system, and compare with the existing priority algorithm in computation time, the re-sults show that the proposed method has superiority in computation time, and the validity of this method.
Keywords:PMU  iterative algorithm  IEEE bus system  optimal allocation  observability