首页 | 本学科首页   官方微博 | 高级检索  
     

炼油企业延迟焦化装置的节能技术改造
引用本文:瞿滨. 炼油企业延迟焦化装置的节能技术改造[J]. 能源工程, 2003, 0(3): 60-62
作者姓名:瞿滨
作者单位:镇海炼油化工股份有限公司,浙江,宁波,315207
摘    要:根据焦化装置的耗能特点,分析了延迟焦化装置的节能途径;以装置过程能量综合优化方法为指导,对我公司延迟焦化装置进行节能技术改造,通过提高装置处理量、优化换热流程以及回收低温热量,使该装置能耗大幅度降低。

关 键 词:能耗  优化  延迟焦化装置  CFB
文章编号:1004-3950(2003)03-0060-03
修稿时间:2003-02-12

Conservation technical reconstruction of delayed coking unit in refinery plant
QU Bing. Conservation technical reconstruction of delayed coking unit in refinery plant[J]. Energy Engineering, 2003, 0(3): 60-62
Authors:QU Bing
Abstract:Based on the characteristics of energy consuming in the delayed coking unit, this article analyzed the energy saving methods. Under guidance of energy optimizing processing, the delayed coking unit of Zhenhai Refining & Chemical Company was reformed for energy saving. The energy consuming declined apparently through optimizing heat exchanging net, reclaiming the lower temperature heat and improving the feedstock.
Keywords:consuming energy  optimizing  delayed cokingunit  CFB
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号