首页 | 本学科首页   官方微博 | 高级检索  
     


Stress redistribution and ground arch development during tunneling
Authors:Chee Nan Chen  Wen-Yen HuangCheng-Tsung Tseng
Affiliation:a Department of Construction Engineering, National Taiwan University of Science & Technology, 43, Section 4, Keelung Road, Taipei 10672, Taiwan, ROC
b Construction and Planning Agency, Ministry of the Interior, No. 342, Sec. 2, Bade Rd., Songshan District, Taipei City 10556, Taiwan, ROC
c Graduate Research Scholar, Department of Construction Engineering, National Taiwan University of Science & Technology, Taipei, Taiwan, ROC
Abstract:Three-dimensional stress adjustment caused by tunneling is related with ground arching development. Investigating the development of ground arching by stress redistribution during tunneling is presented. A three-dimensional numerical simulation model was developed to gain understanding of adjustment of tunneling stress. Vertical stress adjustments σZZ above the tunnel roof during tunneling are analyzed, using four different cover depths H and four lateral pressure coefficients K. Shift of the inflection points of σZZ-depth curves above the tunnel roof during tunneling can be a reliable index to show the development of ground arching.
Keywords:Bench cut tunneling  Cycle  Ground arching  σZZ-depth curves  Triple-circular section
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号