首页 | 本学科首页   官方微博 | 高级检索  
     

公伯峡水电站右岸旋流泄洪洞选型研究
引用本文:陈念水,吴曾谋,王卫国,王凡.公伯峡水电站右岸旋流泄洪洞选型研究[J].西北水电,2006(4):37-42,52.
作者姓名:陈念水  吴曾谋  王卫国  王凡
作者单位:中国水电顾问集团西北勘测设计研究院,西安,710065
摘    要:根据公伯峡水电站特定的水头和泄量,研究了公伯峡水电站导流洞改建成水平旋流泄洪洞和竖井旋流泄洪洞两种型式,并对选定的水平旋流泄洪洞进行了体型优化研究。

关 键 词:公伯峡水电站  导流洞  竖井旋流泄洪洞  水平旋流泄洪洞
文章编号:1006-2610(2006)03-0037-06
收稿时间:2006-08-25
修稿时间:2006-08-25

On flood discharge tunnel with vertex flow for Gongboxia hydropower station
CHEN Nian-shui,WU Zeng-mou,WANG Wei-guo,WANG Fan.On flood discharge tunnel with vertex flow for Gongboxia hydropower station[J].Northwest Water Power,2006(4):37-42,52.
Authors:CHEN Nian-shui  WU Zeng-mou  WANG Wei-guo  WANG Fan
Abstract:In virtue of specific head and discharge of Gongboxia hydropower station,the diversion tunnel was studied to reconstruct into flood discharge tunnel with horizontal vertex flow or flood discharge tunnel with vertical vertex flow.Finally,the optimization was conducted for the selected flood discharge tunnel with horizontal vertex flow.
Keywords:Gongboxia hydropower station  diversion tunnel  flood discharge tunnel with vertical vertex flow  flood discharge tunnel with horizontal vertex flow
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号