地下室顶板超长钢筋混凝土结构无缝设计与施工 |
| |
作者单位: | 中建二局二公司深圳分公司 |
| |
摘 要: | 介绍了ZY补偿收缩混凝土施工技术,阐述了超长钢筋混凝土结构的无缝设计,分析了110m长的钢筋混凝土结构不设后浇带整体浇筑的技术要点。实践证明简便易行的施工工艺可显著地缩短工期,提高工程质量。
|
关 键 词: | 无缝设计 自防水结构 ZY膨胀剂 裂缝控制 |
Seamless Design and Construction of Basement Roof with Super Long Reinforced Concrete Structure |
| |
Authors: | Chao Jin Wang Lu Cui Yanbo |
| |
Abstract: | This article introduces the construction technology of ZY shrinkage-compensate concrete,describes the seamless design for super-long reinforced structure and analyzes technical points of 110m long-scale integral pouring conerete structure without late poured band.It is proved that simple construction technique can not only reduce the construction period but also improve the project quality obviously. |
| |
Keywords: | seamless design self-waterproof configuration ZY-type expansive agent crack control |
本文献已被 CNKI 等数据库收录! |