首页 | 本学科首页   官方微博 | 高级检索  
     

大伙房输水工程隧洞出口段偏压应力分析及施工对策
引用本文:李文富.大伙房输水工程隧洞出口段偏压应力分析及施工对策[J].水利建设与管理,2014(4):20-23.
作者姓名:李文富
作者单位:辽宁省水利厅,沈阳110003
摘    要:辽宁省大伙房水库输水工程隧洞出口段属于强风化的浅埋、偏压不良地质洞段。为保证安全进洞,掌握浅埋偏压隧洞围岩受力情况及变形规律,本文运用非线性有限元法模拟隧洞开挖过程,分析了偏压隧洞开挖后的应力分布状态、围岩变形及稳定性,并据此采取相应的施工对策,顺利地通过了浅埋、偏压的洞口段,确保施工安全的同时保证了工程质量。

关 键 词:输水隧洞  偏压分析  有限元法  施工对策

Bias Stress Analysis of Dahuofang Water Diversion Project Tunnel Outlet Section and Construction Countermeasures
LI Wen-fu.Bias Stress Analysis of Dahuofang Water Diversion Project Tunnel Outlet Section and Construction Countermeasures[J].Water Resources Development & Management,2014(4):20-23.
Authors:LI Wen-fu
Affiliation:LI Wen-fu (Liaoning Provincial Department of Water Resources, Shenyang 110003, China)
Abstract:Liaoning Dahuofang Reservoir Water Diversion Project Tunnel Outlet Section belongs to geological opening section with strong weathered shallow coverage and poor bias stress .Non-linear finite element method is adopted in the paper to simulate tunnel excavation process in order to ensure safe tunnel excavation , and master the force condition and deformation rules of shallow coverage bias stress tunnel surrounding rock .The stress distribution status , surrounding rock deformation and stability after bias stress tunnel excavation are analyzed , corresponding construction strategy is adopted accordingly , shallow coverage and bias pressure opening sections are smoothly constructed , thereby ensuring construction safety, and project quality at the same time .
Keywords:water diversion tunnel  bias stress analysis  finite element method  construction countermeasures
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号