大型倒虹吸压力钢管安装监理质量控制
引用本文:齐江鹏,李青.大型倒虹吸压力钢管安装监理质量控制[J].西北水电,2009(4):25-27.
作者姓名:齐江鹏  李青
作者单位:1. 新疆水利水电勘测设计研究院,新疆乌鲁木齐,830000
2. 新疆林业勘察设计院,新疆乌鲁木齐,830000
摘    要:以某大型倒虹吸压力钢管道工程为例,阐述了监理单位对大型倒虹吸压力钢管安装质量控制过程.该工程监理单位按照事前监理、跟踪监理、施工验收3个环节,对工程质量进行严格把关,有效地控制了工程施工质量.888个钢管安装单元工程全部合格,其中优良单元871个,优良率为 98.1%,工程质量等级评定为优良.

关 键 词:钢管安装  监理  质量控制

Supervision and quality control of installation of large inverted siphon penstocks
QI Jiang-peng,LI Qing.Supervision and quality control of installation of large inverted siphon penstocks[J].Northwest Water Power,2009(4):25-27.
Authors:QI Jiang-peng  LI Qing
Affiliation:1.Xinjiang Survey and Design Institute of Water Resources and Hydropower;Urumuqi 830000;China;2.Xinjiang Forestry Investigation and Design Institute;China
Abstract:The paper describes the quality control by a Supervisor for installation of large inverted siphon penstocks.In accordance with the 3 chains of beforehand supervision,following-up supervision and construction acceptance,the Supervisor strictly checks and efficiently controls the construction quality.All of the 888 penstock installation unit works were qualified,of which 871 unit works were appraised as fine,at a good rate of 98.1%.The quality of the installation works was evaluated as good.
Keywords:penstock installation  supervision  quality control  