首页 | 本学科首页   官方微博 | 高级检索  
     

南水北调东线一期穿黄河工程安全监测设计
引用本文:李善岩,何利华.南水北调东线一期穿黄河工程安全监测设计[J].电力系统自动化,2005,29(1).
作者姓名:李善岩  何利华
作者单位:天津大坝安全监测研究中心,天津市 300222
摘    要:介绍了南水北调东线一期穿黄河工程各建筑物的安全监测项目及监测布置情况,以黄河隧洞和黄河险工大堤作为重点监测对象,监测工程施工期及运行期的安全;并介绍了监测站及监测系统的设计方案。

关 键 词:穿黄河工程  监测  应力
收稿时间:1/1/1900 12:00:00 AM
修稿时间:1/1/1900 12:00:00 AM

Safety Monitoring Design for the First Stage Across Yellow River Project on East Line of South-to-North Water Transfer Project
LI Shan-yan,HE Li-hua.Safety Monitoring Design for the First Stage Across Yellow River Project on East Line of South-to-North Water Transfer Project[J].Automation of Electric Power Systems,2005,29(1).
Authors:LI Shan-yan  HE Li-hua
Abstract:In this paper introduced are the safety monitoring items and monitoring arrangement for the structures of the first stage across the Yellow River project on the east line of the South-to-North Water Transfer Project. The tunnel across the Yellow River and the Yellow River levee are two objects which will be given emphasis to in monitoring so that the project safety can be guaranteed during construction and operation. The design plan of monitoring station and monitoring system is presented.
Keywords:across the Yellow River project  safety monitoring  stress
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号