首页 | 本学科首页   官方微博 | 高级检索  
     


Intelligent controllers for bi-objective dynamic scheduling on a single machine with sequence-dependent setups
Authors:AS Xanthopoulos  DE Koulouriotis  VD Tourassis  DM Emiris
Abstract:This article addresses the problem of dynamic job scheduling on a single machine with Poisson arrivals, stochastic processing times and due dates, in the presence of sequence-dependent setups. The objectives of minimizing mean earliness and mean tardiness are considered. Two approaches for dynamic scheduling are proposed, a Reinforcement Learning-based and one based on Fuzzy Logic and multi-objective evolutionary optimization. The performance of the two scheduling approaches is tested against the performance of 15 dispatching rules in four simulation scenarios with different workload and due date pressure conditions. The scheduling methods are compared in terms of Pareto optimal-oriented metrics, as well as in terms of minimizing mean earliness and mean tardiness independently. The experimental results demonstrate the merits of the proposed methods.
Keywords:Scheduling  Dispatching rules  Reinforcement Learning  Fuzzy Logic  Multi-objective evolutionary optimization
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号