Abstract: | High-voltage power distribution systems are connected in a branch configuration so as to meet the need for highly reliable power service. When service is interrupted the faulty section is automatically isolated and the power supply is rerouted from an adjacent power distribution system thereby minimizing the service interruption area. The faulty section in the power distribution system is quickly located by means of time relays installed in the switchgears. The settings of those time relays, however, must be monitored constantly. For this reason, we have proposed a “section management method” which can supervise each section of the power distribution system. From this method, we developed a prototype automated distribution system for overall management of time relays through the use of internal software, facilities and customer feedback. This paper describes the section management of power distribution systems. |