首页 | 本学科首页   官方微博 | 高级检索  
     

北京西站钢门楼主桁架残余应力检测
引用本文:苏平,段斌,刘明学.北京西站钢门楼主桁架残余应力检测[J].钢结构,1996(4).
作者姓名:苏平  段斌  刘明学
作者单位:冶金部建筑研究总院!100088(苏平,段斌),北京市建筑工程集团公司!100045(刘明学)
摘    要:本文通过采用三种不同测试方法(盲孔、磁测和电测法),对处在高应力状态下进行焊接的节点进行跟踪测试,并对测试结果进行对比分析.

关 键 词:检测  残余应力  盲孔法  磁测法  电测法

RESIDUAL STRESS ANALYSIS OF BEIJING WEST RAILWAYSTATIONS STEEEL CONSTRUCTION
Su Ping Duan Bin.RESIDUAL STRESS ANALYSIS OF BEIJING WEST RAILWAYSTATIONS STEEEL CONSTRUCTION[J].Steel Construction,1996(4).
Authors:Su Ping Duan Bin
Affiliation:Su Ping Duan Bin (Central Research Institute of Building and Construction of MMI 100088)Lio Mingxue (Beijing Building Construction Group Co. 100045)
Abstract:ABSTRACT Three different methods - (blind-hole, magnetic measurement and deformable slice were adopted to measure closely the condition of the highly stressed welded joint, and the measured data have been comparatively analyzed.
Keywords:KEYWORDS test residual stress  blind hole method magnetic test electric test
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号