首页 | 本学科首页   官方微博 | 高级检索  
     

电压暂降与谐波谐振监测点统一优化配置方法
引用本文:李胜文,张世锋,张敏,蒋海玮,徐少博.电压暂降与谐波谐振监测点统一优化配置方法[J].电测与仪表,2023,60(5):145-153.
作者姓名:李胜文  张世锋  张敏  蒋海玮  徐少博
作者单位:国网山西省电力公司电力科学研究院,国网山西省电力公司电力科学研究院,国网山西省电力公司电力科学研究院,新能源电力系统国家重点实验室(华北电力大学),新能源电力系统国家重点实验室(华北电力大学)
基金项目:国网山西省电力公司科技项目(52053018000z)
摘    要:在考虑投资成本具有限定性的前提下,提出了一种电压暂降和谐波谐振监测点的统一优化配置方法。定义并量化了电压暂降可观性指标和谐波谐振可观性指标;综合考虑了电压暂降与谐波谐振可观性以及投资成本经济性,基于层次分析法和模糊综合评价法给出了监测点配置方案综合性能的量化分析方法;提出了以配置方案综合得分最高为目标,以监测装置数不超过限值为约束的监测点统一优化配置模型,并基于离散粒子群优化算法进行求解;基于IEEE-30节点测试系统进行了暂降与谐振监测点统一优化配置,仿真结果表明所提方法可在确保配置方案所需监测装置数满足投资成本限定的条件下,获得电压暂降可观性、谐波谐振可观性与监测装置数目经济性三者协调最优的监测点配置方案。

关 键 词:电压暂降  谐波谐振  可观性指标  监测点优化配置  层次分析法  模糊综合评价
收稿时间:2021/5/17 0:00:00
修稿时间:2021/6/16 0:00:00

Unified Optimal Placement Method of Voltage Sag and Harmonic Resonance Monitoring Points
Li Shengwen,Zhang Shifeng,Zhang Min,Jiang Haiwei and Xu Shaobo.Unified Optimal Placement Method of Voltage Sag and Harmonic Resonance Monitoring Points[J].Electrical Measurement & Instrumentation,2023,60(5):145-153.
Authors:Li Shengwen  Zhang Shifeng  Zhang Min  Jiang Haiwei and Xu Shaobo
Affiliation:State Grid Electric Power Research Institute of Shanxi Electric Power Company,State Grid Electric Power Research Institute of Shanxi Electric Power Company,State Grid Electric Power Research Institute of Shanxi Electric Power Company,State Key Laboratory for Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University),State Key Laboratory for Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)mpany
Abstract:Considering the limitation of investment cost, a unified optimal placement method of voltage sag and harmonic resonance monitoring points is proposed. Firstly, the observability indexes of voltage sag and harmonic resonance are defined and quantified; Secondly, considering the observability of voltage sag and harmonic resonance as well as the cost economy of investment, the quantitative analysis method of the comprehensive performance of monitor placement programme is given based on analytic hierarchy process method and fuzzy comprehensive evaluation method; Then, a unified optimal monitoring points placement model of is proposed, which takes the highest comprehensive score of the monitor placement programme as the objective and the number of monitoring devices not exceeding the limit as the constraint, and is solved based on the discrete particle swarm optimization algorithm; Finally, the unified optimal placement of sag and resonance monitoring points is carried out based on IEEE30 bus test system. The simulation results show that the proposed method can obtain the optimal monitoring programme, whose voltage sag observability, harmonic resonance observability and economy of monitoring devices are coordinated optimal under the condition that the number of monitoring devices meets the investment cost limit..
Keywords:voltage sag  harmonic resonance  observability index  optimal monitor placement  analytic hierarchy process method  fuzzy comprehensive evaluation method
点击此处可从《电测与仪表》浏览原始摘要信息
点击此处可从《电测与仪表》下载全文