改善三峡电站水轮机稳定性的技术措施
引用本文:田子勤.改善三峡电站水轮机稳定性的技术措施[J].中国三峡建设,1996,3(6):12-13.
作者姓名:田子勤
作者单位:长江水利委员会设计院机电处!湖北省宜昌市430010
摘    要:三峡电站水轮机额定出力710MW,与世界上已投运的最大容量和尺寸的混流式水轮机相当。由于三峡电站水头变化范围起出了混流式水轮机常规的适应范围,故三峡水轮机的稳定性引起了国内外同行们的普遍关注。本文结合三峡特定的运行条件,提出了改善三峡水轮机稳定性的综合治理措施,并对各种技术措施进行了分析。

关 键 词:三峡水电站  混流式水轮机  稳定性  水头

Hi-Tech in Use for TGP Phase-1 Construction
Zhou Hougui.Hi-Tech in Use for TGP Phase-1 Construction[J].China Three Gorges Construction,1996,3(6):12-13.
Authors:Zhou Hougui
Affiliation:Zhou Hougui
Abstract:During TGP phase-1 construction, new approaches and hi-tech were employed by Gezhouba Group Corporation in such areas as tunneling, blasting, underwater dredging, cut - off wall construction, RCC construction and formwork techniques, which demonstrated the technical characteristics in TGP phase - 1 construction and which promoted technical progresses for construction.
Keywords:TGP phase-1 construction construction technology  