首页 | 本学科首页   官方微博 | 高级检索  
     

三峡水利枢纽二期导流工程施工进展分析
引用本文:蒋养成. 三峡水利枢纽二期导流工程施工进展分析[J]. 中国三峡建设, 1996, 3(4): 4-6
作者姓名:蒋养成
作者单位:中国长江三峡工程开发总公司工程建设部右岸工程部!湖北省宜昌市443002
摘    要:三峡二期导流工程项目多,工程量大,技术复杂,通过三年的工程实践,逐步掌握了不同工程项目的特点,找出了施工技术难点,制定了周密的工程实施计划,以迎接1997年大江截流。

关 键 词:导流工程  施工进展  施工技术

Analysis on Construction Progress of the Second-stage Diversion Works of the Three Gorges Water Control Project
Jiang Yangcheng. Analysis on Construction Progress of the Second-stage Diversion Works of the Three Gorges Water Control Project[J]. China Three Gorges Construction, 1996, 3(4): 4-6
Authors:Jiang Yangcheng
Affiliation:Jiang Yangcheng
Abstract:The second stage diversion works has more projects with a large quantity, complicated technologies of the Three Gorges project. The features of different projects have been,by and by,grasped;technical problems on the construction have been searched out and an enforcement schedule of the works has been thoroughly made so as to greet the closure of the Yangtze River in the pear of 1997.
Keywords:Diversion works Construction progress Construction technology
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号