摘    要:根据二滩水电站转轮的具体情况,从材料、结构性能、焊接工艺、装备技术等方面,分析总结了进口设备组焊安装、工艺方法等特点。

关 键 词:二滩水电站  转轮  结构性能  热套卡栓  应变测力静平衡  机加工  热处理时效  焊接和可焊性

Assembly Welding of Runner 5 of Ertan Hydropower Station
Zhou Guanbing. Assembly Welding of Runner 5 of Ertan Hydropower Station[J]. Guizhou Water Power, 1998, 0(2)
Authors:Zhou Guanbing
Abstract:According to the status of runners of Ertan Hydropower Station, the features of installation and welding process of assembly welding equipment imported are analyzed from the aspects of materials, structral functions, welding process and equipment technology in the paper.
Keywords:Ertan Hydropower Station   runner   structral function   heat treatment time effectiveness welding possibility