首页 | 本学科首页   官方微博 | 高级检索  
     

基于犹豫度改进的DEMATEL-ISM水电工程施工安全人因分析
引用本文:解文婧,孙开畅,马文俊. 基于犹豫度改进的DEMATEL-ISM水电工程施工安全人因分析[J]. 水力发电, 2021, 0(5): 83-87
作者姓名:解文婧  孙开畅  马文俊
作者单位:三峡大学水利与环境学院
基金项目:国家重点研发计划资助项目(2017YFC0805100)。
摘    要:为有效降低事故发生的概率,引入决策评价试验法(DEMATEL)与解释结构模型(ISM)相结合的风险分析方法,对水电工程高危施工作业中的人为影响因素进行分析.采用修正过的人为因素分类分析系统(HFACS)识别出高危施工作业中12个主要人为影响因素;针对专家在决策时的犹豫心理,引入犹豫度改进DEMATEL方法得出因素间的因...

关 键 词:水电工程  施工安全  人为因素  犹豫度  DEMATEL  ISM  分析

Human Factor Analysis of Hydropower Project Construction Safety Based on DEMATEL-ISM Improved by Hesitance
XIE Wenjing,SUN Kaichang,MA Wenjun. Human Factor Analysis of Hydropower Project Construction Safety Based on DEMATEL-ISM Improved by Hesitance[J]. Water Power, 2021, 0(5): 83-87
Authors:XIE Wenjing  SUN Kaichang  MA Wenjun
Affiliation:(School of Hydraulic&Environmental Engineering,China Three Gorges University,Yichang 443002,Hubei,China)
Abstract:In order to effectively reduce the probability of accidents,a risk analysis method combining decision evaluation test(DEMATEL)and interpretative structure model(ISM)is introduced to analyze the human factors of high-risk operations in the construction of hydropower projects.The modified human factor classification and analysis system(HFACS)is used to identify 12 key human factors in high-risk operations.Aiming at the hesitation psychology of experts in decision-making,the concept of hesitation fuzzy set is introduced,and the causal relationship between factors is obtained by using the hesitation fuzzy DEMATEL method.The DEMATEL is combined with ISM to classify the complex logical relations among factors.This method can effectively identify the key risk factors and action paths in the construction process,and provides a new solution for the safety risk analysis of accidents during the construction period of hydropower projects.
Keywords:hydraulic engineering  construction safety  human factor  hesitance  DEMATEL  ISM  analysis
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号