首页 | 本学科首页   官方微博 | 高级检索  
     

基于改进时间约束Petri网的综合能源系统运行优化及可靠性评估
引用本文:胡列翔,王蕾,董明枫,李宏仲,孙可,胡哲晟.基于改进时间约束Petri网的综合能源系统运行优化及可靠性评估[J].中国电力,2012,53(10):123-132,139.
作者姓名:胡列翔  王蕾  董明枫  李宏仲  孙可  胡哲晟
作者单位:1. 国网浙江省电力有限公司,浙江 杭州 310007;2. 国网浙江省电力有限公司经济技术研究院,浙江 杭州 310008;3. 南方电网江门供电公司,广东 江门 529000;4. 上海电力大学,上海 200090
基金项目:国网浙江省电力公司科技项目(5211JY180016)
摘    要:综合能源系统包含的设备和负荷类型众多,设备之间的耦合方式多样,在实际综合园区建设过程中,对不同供能方式的经济性和可靠性评估显得尤为重要。首先,通过构建冷热供能系统的时序模型、耦合设备和储能装置的通用模型,并结合时间约束Petri网基本建模原理,建立了系统的运行优化模型;然后,对系统中元件两状态模型进行分析,建立系统的状态空间模型;并通过系统状态进行随机抽样并计算相应的供能可靠性指标。最后,通过对含有储热、储电、储气等多能存储的实际综合园区进行算例分析,评估不同运行方式下多能源系统的可靠性和经济性,从而为实际园区建设提供理论分析依据。

关 键 词:综合能源系统  时间Petri网  可靠性  蒙特卡洛模拟法  
收稿时间:2020-03-26

Operation Optimization and Reliability Evaluation of Integrated Energy System Based on Improved Timing Constraint Petri Net
HU Liexiang,WANG Lei,DONG Mingfeng,LI Hongzhong,SUN Ke,HU Zhesheng.Operation Optimization and Reliability Evaluation of Integrated Energy System Based on Improved Timing Constraint Petri Net[J].Electric Power,2012,53(10):123-132,139.
Authors:HU Liexiang  WANG Lei  DONG Mingfeng  LI Hongzhong  SUN Ke  HU Zhesheng
Affiliation:1. State Grid Zhejiang Electric Power Company, Ltd., Hangzhou 310007, China;2. State Grid Zhejiang Economic Research Institute, Hangzhou 310008, China;3. Jiangmen Power Supply Company of Southern Power Grid, Jiangmen 529000, China;4. Shanghai University of Electric Power, Shanghai 200090, China
Abstract:The integrated energy system (IES) contains many types of equipment and load, and the coupling modes between the equipment are varied. In the construction process of actual integrated park, it is very important to evaluate the economy and reliability of different energy supply modes. Firstly, this paper establishes an operation optimization model of the IES system according to the basic modeling principle of the time constraint Petri net (TCPN), and by constructing the timing model of the cool and heat energy supply system, the general model coupling equipment and the energy storage devices. And then, the two-state model of the components in the system is analyzed to establish the system state space model. The corresponding energy supply reliability indexes are calculated by random sampling of the system state. Finally, the reliability and economy of multi-energy system under different operation modes are evaluated through case study of an actual integrated park with multi-energy storage, such as heat storage, electricity storage and gas storage.
Keywords:integrated energy system  timing constraint Petri net  reliability  Monte Carlo simulation method  
点击此处可从《中国电力》浏览原始摘要信息
点击此处可从《中国电力》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号